• Good Quality API 10d Hinged Type Bow Spring Centralizer for Cementing Application
  • Good Quality API 10d Hinged Type Bow Spring Centralizer for Cementing Application
  • Good Quality API 10d Hinged Type Bow Spring Centralizer for Cementing Application
  • Good Quality API 10d Hinged Type Bow Spring Centralizer for Cementing Application

Good Quality API 10d Hinged Type Bow Spring Centralizer for Cementing Application

After-sales Service: on Line Support
Warranty: 1 Year
Certification: API 10d
Surface Treatment: Spraying Plastics
Centralizer Type: Elastic
Structure: Automatic Reversing
Customization:
Manufacturer/Factory, Trading Company
Diamond Member Since 2018

Suppliers with verified business licenses

Jiangsu, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Fast Delivery
The supplier can deliver the goods within 30 days
R&D Capabilities
The supplier has 1 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (6)

Basic Info.

Material
Spring Steel
Type
Centralizer
Inner Diameter
117- 513mm
Height
525- 580mm
Transport Package
Plywood Case
Trademark
Wise Channel
Origin
China
HS Code
8431432000

Product Description

 
Good Quality API 10d Hinged Type Bow Spring Centralizer for Cementing Application
Good Quality API 10d Hinged Type Bow Spring Centralizer for Cementing Application
  1. Usage: The centralizer can ensure that the cement ring outside the casing string has a certain thickness, which can reduce the resistance when casing down to avoid sticking the sleeve. It's suitable for straight or inclined wells.
  2. Principle: The supporting function of the centralizer arch piece can achieve the purpose of centering the casing in the cementing process.
Good Quality API 10d Hinged Type Bow Spring Centralizer for Cementing Application
 
Product Features
Non-welding, formed by mold suppression, with firm structure;
Hinged type design, easy to install. Detachable stacking to save storage and transportation costs;
With the cyclone film, it can improve the replacement efficiency more effectively.
Implementation standard: API 10D-2010.

Technique Parameters:
Model (in) O.D.  (mm) I.D.  (mm) Height (mm)
I.D.  O.D. 
4-1/2 5-7/8 165 117 525
6 180 117 525
6-1/4 180 117 525
6-1/2 194 117 525
7-7/8 232 117 525
8-1/4 232 117 525
8-1/2 232 117 525
5 6-1/4 180 131 525
6-1/2 194 131 525
6-3/4 194 131 525
7-7/8 206 131 525
8-1/4 245 131 525
8-1/2 245 131 525
5-1/2 6-3/4 194 143 522
7-7/8 219 143 522
8-1/2 242 143 522
8-3/4 257 143 522
9-7/8 283 143 520
6-5/8 8-1/2 232 170 520
7 8-1/4 232 182 520
8-1/2 245 182 523
8-3/4 257 182 523
9-7/8 283 182 520
7-5/8 9-7/8 273 196 520
8-5/8 11 298 222 520
12-1/4 368 222 520
9-5/8 11 324 248 520
11-5/8 337 248 520
11-3/4 333 248 522
12-1/4 371 248 525
12-1/2 384 248 525
10-3/4 12-1/4 334 279 525
13-1/2 390 279 536
14-3/4 413 279 536
11-3/4 14-3/4 416 303 535
15-1/2 441 303 535
13-3/8 14-3/4 419 346 535
16 457 346 535
17-1/2 485 346 535
13-5/8 17-1/2 464 351 540
14 17-1/2 473 361 540
16 20 549 410 540
22 613 410 540
18-5/8 22 591 478 560
23 680 478 560
24 680 478 560
26 730 478 580
20 24 650 513 580
26 719 513 580

Good Quality API 10d Hinged Type Bow Spring Centralizer for Cementing ApplicationGood Quality API 10d Hinged Type Bow Spring Centralizer for Cementing ApplicationGood Quality API 10d Hinged Type Bow Spring Centralizer for Cementing ApplicationGood Quality API 10d Hinged Type Bow Spring Centralizer for Cementing ApplicationQ:How can I place order? 
A: You can contact us by email or social media like WhatsApp on the order detail or place order on line. 

Q:How about the payment?
A: For new clients, advance payment(30%-100% of total amount) is required, the balance need to be paid before the delivery after your inspection.


Q:How can I pay you?
A: By T/T (Telegraphic Transfer) or L/C (Letter of Credit). After you receive the PI, you can make the payment through your bank as per the terms mentioned in PI.

Q: What's the order procedure? 
A: First we discuss order details, production details by email ,TM or other social media; then we issue you an PI for your confirmation. You will be requested to make full payment or deposit before we go into production.After we get the deposit, we start to process the order. Depending on the products you order, we usually a couple of days or even moths to complete production if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we shall arrange the shipment for you. 

Q: How do you deal with  defective products received by the clients
A:  If there are some defective items, we usually credit to our customer or replace them in next shipment.
                
                                    




 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now