Toolstring Equipment Wireline Stem/Sinker Bar Standard Stem
Standard Stem
Standard Stem is used to add weights to the wireline toolstring thereby enable the descending toolstring to overcome stuffing box
fiction, well pressure and the effect of fluid viscosity that acts against the toolstring. The increase in mass also aide in converting kinetic
energy into upward and downward jarring impact.
Rule of thumb to determine the weight of a solid steel stem per foot length is:Weight (lbs/ft) =Stem OD2 x 8/3
Available tool sizes as shown. Weight shown is for (UN Thread) reference only. Please contact our sales office for further enquiries.
Tools 0.D |
Fishneck 0.D. |
Thread Connection |
Length |
Weight (LB) |
Weight (KG) |
1.25" |
1.187" |
15/16"-10 |
24" |
8.4 |
3.8 |
15/16"-10 |
36" |
12.8 |
5.8 |
15/16"-10 |
60" |
20.9 |
9.5 |
1.50" |
1.375" |
15/16"-10 |
24" |
11.0 |
5.0 |
15/16"-10 |
36" |
17.6 |
8.0 |
15/16"-10 |
60" |
28.7 |
13.0 |
1.875" |
1.75" |
1 1/16"-10 |
24" |
17.6 |
8.0 |
1 1/16"-10 |
36" |
26.5 |
12.0 |
1 1/16"-10 |
60" |
45.2 |
20.5 |
2.125" |
1.75" |
1 1/16"-10 |
24" |
22.9 |
10.4 |
1 1/16"-10 |
36" |
34.8 |
15.8 |
1 1/16"-10 |
60" |
58.6 |
26.6 |
2.50" |
2.313 |
1 1/16"-10 or 1 19/6"-10 |
24" |
31.3 |
14.2 |
1 1/16"-10 or 1 19/6"-10 |
36" |
48.5 |
22.0 |
1 1/16"-10 or 1 19/6"-10 |
60" |
81.6 |
37.0 |
Q:How can I place order?
A: You can contact us by email or social media like WhatsApp on the order detail or place order on line.
Q:How about the payment?
A: For new clients, advance payment(30%-100% of total amount) is required, the balance need to be paid before the delivery after your inspection.
Q:How can I pay you?
A: By T/T (Telegraphic Transfer) or L/C (Letter of Credit). After you receive the PI, you can make the payment through your bank as per the terms mentioned in PI.
Q: What's the order procedure?
A: First we discuss order details, production details by email ,TM or other social media; then we issue you an PI for your confirmation. You will be requested to make full payment or deposit before we go into production.After we get the deposit, we start to process the order. Depending on the products you order, we usually a couple of days or even moths to complete production if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we shall arrange the shipment for you.
Q: How do you deal with defective products received by the clients?
A: If there are some defective items, we usually credit to our customer or replace them in next shipment.